Grand Street Safety Improvements and Rehabilitation

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the work to be performed under these specifications consists of the roadway rehabilitation of Grand Street from Shoreline Drive to Otis Drive in Alameda California. The work to be performed includes, but is not limited to mobilizing, traffic and pedestrian control to manage and close off work areas from pedestrians and parking, clearing and grubbing, tree protection, removal of existing asphalt concrete pavement, removal of existing concrete including curb, curb and gutter, sidewalk, transit islands, and curb ramps, removal, stockpiling and disposal of base materials, adjusting utility covers, new sidewalk, curb, curb and gutter and curb ramps, subgrade preparation (with over-excavation as needed), excavation, overlay of new hot mix asphalt (HMA) on roadway, K- 71 bollards, railing, striping and signage, and painted curb.

Status

Accepting Bids

Bid Date 1/9/25 2:00pm

Company & Contacts

City of Alameda, Public Works Department
Ali Hatefi  

Engineer’s estimate is $1,400,000