FY2024-25 Sidewalk Replacement Project
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removal and replacement of damaged sections of existing concrete sidewalk including root cutting, curb, gutter, and driveway; repairing sections of failed asphalt concrete pavement; and replacement of curb drain outlets, and concrete repair of adjacent sidewalk flags. The work shall include traffic control, saw cutting, excavation, backfilling, compaction; installation of root barriers, patching asphalt conforms adjacent to new gutters, and clearing and grubbing.
Status
Accepting Bids
Bid Date | 1/6/25 2:00pm |