Clement Avenue Safety Improvements Projects
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing the railroad tracks and ties, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.
Plans
(click to expand/collapse)
Name | Size | ||
PLANS - 2023-08-04_Clement | 94.5 MB |