Alameda Point Build 24 Roof Replacement Project
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removal of the existing membrane roof, mechanical roof units; and replacement with a new membrane roof system on the main building of 2301 Monarch Street ("Building 24”).
Plans
(click to expand/collapse)
Name | Size | ||
20240715_Alameda Point Bldg_Final Dwg Set | 1.4 MB |