Lagoon 5 Dredging Project and Lagoon System Outfall Maintenance Project

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with excavation of accumulated material from Lagoon 5 in the area shown on the plans, including mobilization, demobilization, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work to complete the project at the locations designated in the plans.

Status

Bidding Closed

Prebid Date 8/7/24 2:30pm
Bid Date 8/20/24 1:00pm

Company & Contacts

City of Alameda, Public Works Department
Aaliyah Douglas  
(510) 747 – 7941

Lagoon 5 Dredging Project $359,000

Lagoon System Outfall Maintenance Project: $387,000

Total Cost for both projects: $746,000

There is a mandatory on-site Pre-Bid Meeting scheduled for August 7, 2024, at 2:30pm. ALL bidders must attend. Prospective bidders will meet at the access path between 2811 and 2815 Bayview Drive. On street parking is available on Bayview Drive. A sign-in sheet will be issued, and shared, to record attendees.