Lagoon 5 Dredging Project and Lagoon System Outfall Maintenance Project

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with excavation of accumulated material from Lagoon 5 in the area shown on the plans, including mobilization, demobilization, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work to complete the project at the locations designated in the plans.
Plans (click to expand/collapse)