Cyclic Sewer Replacement Project, Phase 21

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing sanitary sewer mains, sewer laterals, maintenance holes, cleanouts, curb, gutter, sidewalk, driveway, street patch, water pollution control, traffic controls and all other associated work to complete the project at the locations designated in the plans.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
9135 Addendum1 00300 attachment 176.6 KB
PHASE 21_addendumNo1 82.0 KB