Alameda Point Building 116 Demolition
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with abatement, demolition and disposal of the Building at 2501 Todd Street (“Building 116”).
Bid Documents
(click to expand/collapse)

Name | Size | ||
AP Bldg 116 Demolition_Bid-Front Ends_Final | 6.3 MB |