C65600 Central Ave Safety Improvements Project

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing existing signals and cabinets, installing new roundabouts, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, landscaping, drainage improvements, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.

Status

Bidding Closed

Prebid Date7/15/24 3:00pm

Bid Date8/8/24 2:30pm

Company & Contacts

City of Alameda, Public Works Department
Brendin Christolear  
510-747-7929

Approximate cost of construction: $15,270,000