C65600 Central Ave Safety Improvements Project
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing existing signals and cabinets, installing new roundabouts, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, landscaping, drainage improvements, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.
Addendum 1
(click to expand/collapse)
Name | Size | |||
20240718 ADDENDUM NO1_signed | 11.6 MB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
20240725 ADDENDUM NO2_signed | 37.7 MB |
Addendum 3
(click to expand/collapse)
Name | Size | |||
20240730 ADDENDUM NO3_signed | 36.1 MB |
Addendum 4
(click to expand/collapse)
Name | Size | |||
20240701 ADDENDUM NO4_signed | 408.1 KB |
Addendum 5
(click to expand/collapse)
Name | Size | |||
20240806 ADDENDUM NO5_signed | 531.3 KB |