C65600 Central Ave Safety Improvements Project
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing existing signals and cabinets, installing new roundabouts, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, landscaping, drainage improvements, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.
Specifications
(click to expand/collapse)
Name | Size | ||
20240702 1Q390-Central Ave-IFB Project Manual | 39.4 MB |