C65600 Central Ave Safety Improvements Project
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing existing signals and cabinets, installing new roundabouts, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, landscaping, drainage improvements, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.
Status
Bidding Closed
Prebid Date | 7/15/24 3:00pm |
Bid Date | 8/8/24 2:30pm |
Company & Contacts
City of Alameda, Public Works Department
Brendin Christolear
510-747-7929
Approximate cost of construction: $15,270,000